Well Pad Inspections

Well Pad Inspections image

Piping

Inspections satisfy API 571 Piping Inspection Code:

  • 602, 1002, 1502 flow line
  • Sour and standard service
  • Line Pipes Pressure Vessels

 

Pressure Vessels

Inspections satisfy API 510 Pressure Vessel Inspection Code:

  • Sand Traps
  • 2 & 3-Phase Separators
  • Heater Treaters
  • Line Heaters
  • Dehydration Contact Towers
  • Coalescing Filter Separators o Surge Tanks
  • Pressurized Storage Tanks Storage Tanks

 

Storage Tanks

Acoustic Emission Testing of Valves

Inspections satisfy API 653 & STI SP001 Aboveground Storage Tank Inspection Code: Compliant

  • Brine Tanks
  • Slop Tanks
  • Water Storage Tanks
  • Fuel Storage Tanks

 

Continuous Monitoring of Weld Pad Equipment

  • Wireless UT monitoring in high erosion areas wear blow out occurs
    • Measurement accuracy of +/- 0.0004”
    • Record reliable, repeatable and credible material loss due to corrosion and erosion as a function of time
    • Remotely take readings on demand or on an established reporting schedule
  • Vibration monitoring and analysis
    • Wireless vibration and temperature sensors are installed on equipment to track the real-time condition of equipment on the well pad during drilling operations.
    • Accurate analysis directly predicts system repairs requirements which results in significant cost savings
  • Leak and Fatigue Crack Detection using Acoustic Emission
    • Monitor valves for leaks
    • Detect leaks in real-time
    • Detect fatigue related flaws